Evaluate technical bid proposals
Score technical criteria, verify mandatory documentary clearances, and determine technical qualification.
1. Overview & Business Value#
This comprehensive operational guide details the architecture, business workflows, configuration parameters, and execution steps for Evaluate technical bid proposals within SmartERP.
This guide explains how evaluation committee members score technical proposals.
{screenshot:evaluate-technical-bids-overview-dashboard}
2. Prerequisites & Security Access Groups#
- Required Modules:
purchase, stock, smarterp_store_voucher, purchase_requisition - Security Groups:
Purchase User(Technical ID:purchase.group_purchase_user)Purchase Administrator(Technical ID:purchase.group_purchase_manager)Inventory User / Storekeeper(Technical ID:stock.group_stock_user)
- Master Data Dependencies: Product masters, units of measure, approved supplier catalog, warehouse storage locations, and procurement budget lines.
3. Step-by-Step Configuration & Execution#
Step 1: Navigating to the Module Interface#
- Log into your SmartERP instance at
https://smarterp.et/odoo. - Open the main App Switcher (grid icon in the top-left corner).
- Select the Purchase app icon.
- From the top navigation bar, open Purchase β Orders β Purchase Orders / Requisitions; Inventory β Operations.
{screenshot:evaluate-technical-bids-app-switcher-navigation}
Step 2: Creating and Parameterizing Records#
- Click the New button in the top-left control panel.
- Complete the mandatory fields in the record form:
- Vendor / Supplier (Mandatory): Approved vendor profile with verified commercial license and TIN
- Order Lines & Products (Mandatory): Specified items with precise quantities, units of measure, and unit costs
- Delivery Destination (Mandatory): Physical store or warehouse receiving location
- Fiscal Position & Taxes (Mandatory): Statutory 15% VAT and applicable withholding tax terms
- Configure optional operational parameters and localized tags as required:
- Requisition Reference (Optional): Link to approved departmental purchase requisition
- Payment Terms (Optional): Contractual settlement schedule (Net 30, Advance, LC)
- Incoterm & Port (Optional): Shipping terms for import consignments (FOB Djibouti, CIF Bole)
- Click the Save icon in the control bar to commit the record.
{screenshot:evaluate-technical-bids-record-creation-form}
Step 3: Validating and Processing Transactions#
- State Transitions: Execute operational state progression (Draft RFQ β Sent β Confirmed Order β Received (GRN) β Billed β Locked).
- Ledger & System Impact: GRN validation posts stock valuation entries; vendor bill confirmation posts accounts payable and statutory withholding tax liabilities.
- Audit Verification: Automated recording of author ID, timestamp, and immutable revision history.
{screenshot:evaluate-technical-bids-transaction-processing-state}
Scoring Procedure#
- Open Purchase β Sourcing β Technical Evaluations.
- Open a qualified bidder submission.
- Review Mandatory Compliance Checklist:
- Valid Trade License: Pass / Fail.
- Tax Clearance Certificate: Pass / Fail.
- VAT Registration Certificate: Pass / Fail.
- Verified CPO Bid Bond: Pass / Fail.
- In Technical Criteria Matrix, enter scores from
0to100for each sub-criterion:- Technical Specifications compliance (e.g. 50 points max).
- Experience in similar contracts (e.g. 25 points max).
- Personnel qualifications (e.g. 15 points max).
- Delivery schedule (e.g. 10 points max).
- Enter factual justifications in the Evaluator Comments field.
- Click Submit My Score.
Aggregation and Qualification#
SmartERP averages the scores across all certified committee members:
- Bidders achieving an average score $\ge 70.0$ points are flagged as Technically Qualified.
- Bidders scoring $< 70.0$ points are flagged as Technically Disqualified and will not proceed to commercial unsealing.
4. Advanced Configuration Points#
- Automated Actions & Scheduled Tasks (Crons):
Procurement: Run scheduler (reordering rules)(stock.ir_cron_run_procurement): Runs daily to generate RFQs for inventory items below safety stockStock: Expired lot quarantine trigger(stock.ir_cron_quarantine_expired): Runs daily to isolate batches past shelf lifePurchase: Check supplier delivery deadlines(purchase.ir_cron_check_deadlines): Runs daily to send automated expediting notices to suppliers
- Custom Print Templates & Reports:
- Purchase Order Confirmation (Commercial Contract)
- Ethiopian Goods Receiving Note (GRN / Model 19)
- Store Issue Voucher (SIV / Model 20)
- Vendor Bid Evaluation & Comparison Matrix
- Multi-Company Rules: Record-level security isolation under Company 1 (
Ashewa Technology Solutions S.C.), preventing cross-company ledger leakage across parent and subsidiary legal entities.
5. Comprehensive Troubleshooting Matrix#
| Error Symptom / Exception | Probable Root Cause | Corrective Action / Resolution |
|---|---|---|
Access Rights Error: Cannot confirm Purchase Order | User lacks purchase manager approval privileges. | Escalate order to user with purchase.group_purchase_manager clearance. |
Validation Error: Stock move destination missing | Operation type lacks default internal destination location. | Configure target warehouse location in Inventory β Configuration β Operation Types. |
Quantity Mismatch: GRN vs PO 3-way match failed | Delivered quantity exceeds purchase order limit beyond allowable tolerance. | Verify physical delivery against supplier delivery slip and issue an amended PO or return voucher. |
Budget Reservation Error: Insufficient funds | Departmental budget allocation exhausted for target analytic account. | Submit a budget transfer or supplementary allocation request to the Finance Director. |
Next#
- Commercial unsealing: Unseal commercial bids and compute total score.
Last updated: 2026-10-30