Execute BoM Cost Roll-Up and Standard Costing

Calculating total product cost across raw ingredients, labor hours, machine overhead, and updating standard prices.

1. Overview & Business Value#

This comprehensive operational guide details the architecture, business workflows, configuration parameters, and execution steps for Execute BoM Cost Roll-Up and Standard Costing within SmartERP.

Calculating total product cost across raw ingredients, labor hours, machine overhead, and updating standard prices.

{screenshot:standard-costing-and-bom-rollup-overview-dashboard}

2. Prerequisites & Security Access Groups#

  • Required Modules: mrp, quality_control, smarterp_manufacturing_costing
  • Security Groups:
    • Manufacturing User (Technical ID: mrp.group_mrp_user)
    • Manufacturing Administrator (Technical ID: mrp.group_mrp_manager)
    • Quality Inspector (Technical ID: quality.group_quality_user)
  • Master Data Dependencies: Bills of Materials (BoM), routing operations, work centers with machine/labor hourly rates, raw material stock, and inspection checkpoints.

3. Step-by-Step Configuration & Execution#

Step 1: Navigating to the Module Interface#

  1. Log into your SmartERP instance at https://smarterp.et/odoo.
  2. Open the main App Switcher (grid icon in the top-left corner).
  3. Select the Manufacturing app icon.
  4. From the top navigation bar, open Manufacturing → Operations → Manufacturing Orders / Work Orders; Quality → Quality Control.

{screenshot:standard-costing-and-bom-rollup-app-switcher-navigation}

Step 2: Creating and Parameterizing Records#

  1. Click the New button in the top-left control panel.
  2. Complete the mandatory fields in the record form:
    • Finished Product (Mandatory): Manufacturable item variant linked to an active Bill of Materials
    • Quantity to Produce (Mandatory): Target production batch volume in standard unit of measure
    • Bill of Materials (BoM) (Mandatory): Active engineering recipe defining component roll-ups and operation steps
    • Scheduled Date (Mandatory): Target production execution date and shift allocation
  3. Configure optional operational parameters and localized tags as required:
    • Work Center Routing (Optional): Specific shop floor machine or assembly station sequence
    • Lot / Serial Number (Optional): Assigned traceability lot for finished goods batch tracking
    • Analytic Cost Account (Optional): Cost absorption center for direct labor and utility overhead
  4. Click the Save icon in the control bar to commit the record.

{screenshot:standard-costing-and-bom-rollup-record-creation-form}

Step 3: Validating and Processing Transactions#

  • State Transitions: Execute operational state progression (Draft → Confirmed → In Production → Quality Gate Passed → Done → Cost Closed).
  • Ledger & System Impact: Consumes raw materials from inventory (crediting stock valuation), absorbs labor/machine overhead, and debits finished goods inventory at actual cost.
  • Audit Verification: Automated recording of author ID, timestamp, and immutable revision history.

{screenshot:standard-costing-and-bom-rollup-transaction-processing-state}

Principles of Cost Roll-Up#

A finished good's standard unit cost comprises three structural cost layers:

  1. Direct Material Cost: $\sum (\text{Component Quantity} \times \text{Standard Cost} \times [1 + \text{Scrap \%}])$
  2. Direct Labor Cost: $\sum (\text{Routing Operation Run Time} \times \text{Labor Hourly Rate})$
  3. Machine Overhead Absorption: $\sum (\text{Work Center Machine Time} \times \text{Work Center Hourly Rate})$

[mrp-bom-cost-rollup]

Procedure: Running an Automated Cost Roll-Up#

  1. Open the target product's active Bill of Materials.
  2. In the top action bar, click Cost Analysis / Compute BoM Cost.
  3. SmartERP recursively evaluates every sub-assembly and component price in the tree.
  4. The system displays the comprehensive cost breakdown table:
    • Total Component Cost: e.g., 4,210.50 ETB
    • Total Operation Cost: e.g., 920.00 ETB
    • Total Calculated Unit Cost: 5,130.50 ETB
  5. Click Apply to Product Master.
  6. The product standard cost is updated, establishing the benchmark for subsequent manufacturing variance analysis.

4. Advanced Configuration Points#

  • Automated Actions & Scheduled Tasks (Crons):
    • MRP: Recalculate BoM standard costs (mrp.ir_cron_bom_cost_roll): Runs weekly to update standard costing from latest procurement purchase prices
    • Quality: Trigger periodic inspection alerts (quality.ir_cron_inspection_check): Runs daily to flag mandatory quality testing queues
    • Workcenter: Update OEE statistics (mrp.ir_cron_workcenter_oee): Runs hourly to compute Overall Equipment Effectiveness metrics
  • Custom Print Templates & Reports:
    • Production Order Traveler & Pick List
    • Shop Floor Work Order Execution Slip
    • Quality Inspection Certificate & Non-Conformance Report
    • Manufacturing Cost Analysis & Variance Ledger
  • Multi-Company Rules: Record-level security isolation under Company 1 (Ashewa Technology Solutions S.C.), preventing cross-company ledger leakage across parent and subsidiary legal entities.

5. Comprehensive Troubleshooting Matrix#

Error Symptom / ExceptionProbable Root CauseCorrective Action / Resolution
BoM Missing Error: No active Bill of Materials foundProduct variant lacks a verified and confirmed BoM in the system.Create and confirm an active BoM under Manufacturing → Products → Bills of Materials.
Component Shortage Block: Insufficient stockRaw material components have not been transferred to the shop floor location.Execute an internal transfer from main warehouse to production staging location.
Quality Gate Blocked: Mandatory test failedWork order failed critical quality tolerance threshold.Perform required corrective rework or request authorized Quality Manager override.
Workcenter Capacity OverloadScheduled production duration exceeds available work center shift capacity.Adjust scheduled start dates or distribute load across alternative work centers.