Add materials to plan
Plan vehicles, rooms and equipment on the same schedule as people, by creating them as materials with working hours and roles.
A material is anything you plan that is not a person: a van, a meeting room, a machine. This page is for planners. You need to be a Planning Administrator. Materials share the schedule, the roles and the shift form with employees, so a booking of the van next to the driver's shift is one picture.
Create a material#
- Open Planning → Configuration → Materials and press New.
- In Name, type the name, for example
Delivery van 1. - Check that Type is Material. The list is opened with this type already chosen.
- In Working Time, choose the working calendar that says when the material is available. The calendar decides its Available hours on the schedule and in the utilisation report. A material with no calendar has no available hours, so any planned hour makes it Overloaded.
- Choose the Timezone where the material is used.
- In the Planning group, choose the Planning Roles the material can be planned for, for example a role
Delivery vehicle. Choose a Default Planning Role if one fits. A shift for the material then starts with that role. - Save.
Plan the material#
Create shifts for it exactly as for a person; see Create a shift. On the schedule a material has a box icon instead of initials, and its workload figure is shown without a colour judgement.
What is different for materials#
- Auto Plan and open shift broadcasts only choose people, never materials.
- A material has no user, so it cannot take, give up or switch shifts, and has no email address: it is never notified.
- The Utilisation report has the filters Employees and Materials to separate them; the capacity figures on the dashboard count people only.
- A shift for a material still has a role, a cost and an allocated time, worked out from the material's calendar.