Multi-Tier Credit Committee Approval Routing
Configure automated approval thresholds, multi-tier committee governance, voting quorums, and loan sanction letters.
1. Overview & Business Value#
This comprehensive operational guide details the architecture, business workflows, configuration parameters, and execution steps for Multi-Tier Credit Committee Approval Routing within SmartERP.
Configure automated approval thresholds, multi-tier committee governance, voting quorums, and loan sanction letters.
{screenshot:credit-committee-approval-workflow-overview-dashboard}
2. Prerequisites & Security Access Groups#
- Required Modules:
smarterp_sacco_core, smarterp_equb, smarterp_loan_management - Security Groups:
SACCO Loan Officer(Technical ID:smarterp_sacco.group_sacco_officer)SACCO Credit Committee Member(Technical ID:smarterp_sacco.group_sacco_committee)SACCO General Manager(Technical ID:smarterp_sacco.group_sacco_manager)
- Master Data Dependencies: Member KYC profiles, share capital registers, savings product tiers, loan products with reducing-balance schedules, and Equb rotational pool configurations.
3. Step-by-Step Configuration & Execution#
Step 1: Navigating to the Module Interface#
- Log into your SmartERP instance at
https://smarterp.et/odoo. - Open the main App Switcher (grid icon in the top-left corner).
- Select the SACCO & Equb app icon.
- From the top navigation bar, open SACCO & Equb → Members → KYC Registry / Savings Accounts / Loan Applications / Equb Pools.
{screenshot:credit-committee-approval-workflow-app-switcher-navigation}
Step 2: Creating and Parameterizing Records#
- Click the New button in the top-left control panel.
- Complete the mandatory fields in the record form:
- Member Identification Number (Mandatory): Unique membership number complying with Ethiopian Cooperative Commission rules
- Full Name & Kebele ID (Mandatory): Verified member identity with physical residence verification
- Share Capital Subscriptions (Mandatory): Subscribed shares not exceeding statutory 10% member ceiling (Proclamation 985/2016)
- Primary Savings Product (Mandatory): Compulsory regular monthly savings account configuration
- Configure optional operational parameters and localized tags as required:
- Guarantor & Collateral (Optional): Approved co-signers with locked savings accounts or registered vehicle/property lien
- Equb Rotational Group (Optional): Linked digital Equb pool with lottery draw eligibility
- Beneficiary Nominee (Optional): Designated next of kin for death or disability benefit transfer
- Click the Save icon in the control bar to commit the record.
{screenshot:credit-committee-approval-workflow-record-creation-form}
Step 3: Validating and Processing Transactions#
- State Transitions: Execute operational state progression (Application → KYC Verified → Approved → Active / Disbursed → Delinquency Monitored → Settled).
- Ledger & System Impact: Loan disbursement debits loans receivable and credits cash/bank; loan repayments credit interest income and loan principal, updating 5-tier NBE provisioning registers.
- Audit Verification: Automated recording of author ID, timestamp, and immutable revision history.
{screenshot:credit-committee-approval-workflow-transaction-processing-state}
Multi-Tier Approval Governance Hierarchy#
To eliminate fraud and credit concentration risks, SmartERP routes loan applications through tiered approval gates based on monetary thresholds:
| Loan Amount Threshold | Required Approval Authority | Quorum Requirement |
|---|---|---|
| Up to 25,000 ETB | Branch Credit Officer | Single Sign-off |
| 25,001 to 100,000 ETB | Branch Manager + Credit Committee | Majority Vote (2 of 3) |
| 100,001 to 500,000 ETB | Central Credit Committee | Full Quorum (3 of 5) |
| Above 500,000 ETB | Board of Directors Approval | Board Resolution Majority |
Executing Committee Voting & Approval#
- Committee members log into SACCO > Loans > Committee Review Workspace.
- Select pending loan application; review:
- Credit appraisal score and DTI ratios.
- 3x savings verification proof.
- Verified peer guarantor agreements.
- Committee members record electronic votes:
- Approve: With or without condition.
- Reject: Must record mandatory statutory rejection reason.
- Request Revision: Return for additional collateral or reduced tenure.
- Once voting threshold satisfies quorum, the status updates to
Sanctioned / Approved. - The system generates the official Loan Sanction Letter and promissory note.
4. Advanced Configuration Points#
- Automated Actions & Scheduled Tasks (Crons):
SACCO: Accrue monthly member savings interest(smarterp_sacco.ir_cron_savings_interest): Runs on the final day of each calendar month to credit interestLoan: Evaluate 5-tier NBE delinquency classification(smarterp_sacco.ir_cron_loan_delinquency): Runs nightly to compute loan loss provisions per NBE directivesEqub: Execute scheduled lottery draw(smarterp_sacco.ir_cron_equb_draw): Runs on defined pool cycle dates using provably fair random selection
- Custom Print Templates & Reports:
- Member Savings Passbook & Transaction Ledger
- Loan Amortization Schedule (Reducing Balance)
- NBE 5-Tier Delinquency & Loan Loss Provisioning Statement
- Annual Patronage Dividend Distribution Schedule
- Multi-Company Rules: Record-level security isolation under Company 1 (
Ashewa Technology Solutions S.C.), preventing cross-company ledger leakage across parent and subsidiary legal entities.
5. Comprehensive Troubleshooting Matrix#
| Error Symptom / Exception | Probable Root Cause | Corrective Action / Resolution |
|---|---|---|
Loan Blocked: Exceeds 3x savings ceiling | Requested loan principal exceeds 300% of member unencumbered savings balance. | Increase compulsory savings deposit or provide authorized co-signers with sufficient collateral. |
Equb Draw Blocked: Participant arrears detected | Selected Equb member has unpaid rotational dues in current or prior cycles. | Collect outstanding contribution payment before executing lottery draw. |
Share Capital Limit Error: Member exceeds 10% ceiling | Subscribed shares exceed statutory maximum under Proclamation No. 985/2016. | Restrict share allocation to maximum allowable 10% total cooperative equity threshold. |