የSmartERP መመሪያ የAshewa Technology Solutions መድረክ
ይህ ገጽ ገና ወደ አማርኛ አልተተረጎመም። የእንግሊዝኛው ጽሑፍ ቀርቧል።

Set Performance Targets and Red-Amber-Green (RAG) Thresholds

Configuring baseline benchmarks, stretch targets, Red-Amber-Green tolerance bands, and perspective weighting.

1. Overview & Business Value#

This comprehensive operational guide details the architecture, business workflows, configuration parameters, and execution steps for Set Performance Targets and Red-Amber-Green (RAG) Thresholds within SmartERP.

Configuring baseline benchmarks, stretch targets, Red-Amber-Green tolerance bands, and perspective weighting.

{screenshot:target-setting-and-rag-thresholds-overview-dashboard}

2. Prerequisites & Security Access Groups#

  • Required Modules: smarterp_balanced_scorecard, smarterp_strategy
  • Security Groups:
    • Strategy Officer (Technical ID: smarterp_balanced_scorecard.group_bsc_user)
    • Strategy Director (Technical ID: smarterp_balanced_scorecard.group_bsc_manager)
    • Executive Committee Member (Technical ID: smarterp_balanced_scorecard.group_bsc_executive)
  • Master Data Dependencies: Strategic themes, 4 BSC perspectives (Financial, Customer, Internal Process, Learning & Growth), corporate KPIs, and quarterly appraisal periods.

3. Step-by-Step Configuration & Execution#

Step 1: Navigating to the Module Interface#

  1. Log into your SmartERP instance at https://smarterp.et/odoo.
  2. Open the main App Switcher (grid icon in the top-left corner).
  3. Select the Strategic Execution app icon.
  4. From the top navigation bar, open Strategic Execution → Perspectives → Strategic Objectives / KPIs / Action Plans.

{screenshot:target-setting-and-rag-thresholds-app-switcher-navigation}

Step 2: Creating and Parameterizing Records#

  1. Click the New button in the top-left control panel.
  2. Complete the mandatory fields in the record form:
    • Objective / KPI Name (Mandatory): Precise strategic outcome statement
    • Perspective (Mandatory): One of the 4 balanced perspectives with mandated weighting
    • Weight (%) (Mandatory): Percentage allocation contributing to overall perspective score
    • Target Value & Baseline (Mandatory): Quantifiable numerical goal and historical starting point
  3. Configure optional operational parameters and localized tags as required:
    • Calculation Formula (Optional): Automated SQL query or module model metric extraction
    • Initiative Champion (Optional): Department head or senior manager accountable for result
    • Review Frequency (Optional): Monthly, quarterly, or annual appraisal cadence
  4. Click the Save icon in the control bar to commit the record.

{screenshot:target-setting-and-rag-thresholds-record-creation-form}

Step 3: Validating and Processing Transactions#

  • State Transitions: Execute operational state progression (Draft → Active Target → Mid-Term Review → Final Appraisal → Locked).
  • Ledger & System Impact: Financial perspective KPIs dynamically read General Ledger balances, revenue growth metrics, and cost ratios directly from the accounting engine.
  • Audit Verification: Automated recording of author ID, timestamp, and immutable revision history.

{screenshot:target-setting-and-rag-thresholds-transaction-processing-state}

Target Setting Methodology#

Every KPI requires calibrated baseline benchmarks and realistic stretch targets aligned with annual operating plans (AOP).

Red-Amber-Green (RAG) Tolerance Limits#

SmartERP standardizes performance evaluation using five-tier RAG tolerance bands:

Score >= 100%: Outstanding Performance (Dark Green)
Score 90% - 99%: Target Met (Green)
Score 75% - 89%: Minor Deviation / Attention Required (Amber)
Score 50% - 74%: Significant Underperformance (Red)
Score < 50%: Critical Failure (Dark Red)

Procedure: Setting RAG Bands#

  1. On the KPI form, switch to the Targets & Thresholds tab.
  2. Select current fiscal year (e.g., 2019 E.C. / 2026-2027 G.C.).
  3. Enter targets per period:
    • Q1 Target: 100,000,000 ETB.
    • Q2 Target: 120,000,000 ETB.
    • Q3 Target: 135,000,000 ETB.
    • Q4 Target: 150,000,000 ETB.
  4. Define RAG Threshold Percentages:
    • Green Minimum: 90%.
    • Amber Range: 75% - 89%.
    • Red Trigger: Below 75%.
  5. Set Weighting Percentage (e.g., 20% of the Financial Perspective).
  6. Click Save.

4. Advanced Configuration Points#

  • Automated Actions & Scheduled Tasks (Crons):
    • BSC: Calculate quarterly KPI achievements (smarterp_bsc.ir_cron_compute_kpi): Runs quarterly on the 5th to compute composite achievement scores
    • BSC: Issue appraisal cascade reminders (smarterp_bsc.ir_cron_appraisal_alert): Runs monthly to remind objective champions to update progress
  • Custom Print Templates & Reports:
    • Institutional Balanced Scorecard Executive Dashboard
    • Departmental Strategic Cascade Matrix
    • KPI Performance Variance & Trend Analysis
    • Corporate Strategy Execution Summary
  • Multi-Company Rules: Record-level security isolation under Company 1 (Ashewa Technology Solutions S.C.), preventing cross-company ledger leakage across parent and subsidiary legal entities.

5. Comprehensive Troubleshooting Matrix#

Error Symptom / ExceptionProbable Root CauseCorrective Action / Resolution
Weighting Error: Perspective weights do not equal 100%Total weights assigned to objectives within perspective fail to sum to 100.00%.Adjust individual objective weightings so the perspective total equals exactly 100%.
Data Feed Error: Automated KPI metric returned nullUnderlying model query failed or target database view has no records.Verify connected model name and filter domain in the KPI automated calculation parameters.
Lockout Error: Period results locked for executive reviewCurrent appraisal quarter has been locked by the Strategy Director.Obtain written authorization and request temporary unlock from the Strategy Director.
መጨረሻ የተሻሻለው: 2026-10-30