Manage Construction Site Material Store Requests (SIV)
Requisitioning bulk site materials (cement, rebar, aggregates, timber), wastage thresholds, and Model 20 SIV reconciliation.
1. Overview & Business Value#
This comprehensive operational guide details the architecture, business workflows, configuration parameters, and execution steps for Manage Construction Site Material Store Requests (SIV) within SmartERP.
Requisitioning bulk site materials (cement, rebar, aggregates, timber), wastage thresholds, and Model 20 SIV reconciliation.
{screenshot:construction-material-requisitions-overview-dashboard}
2. Prerequisites & Security Access Groups#
- Required Modules:
project, smarterp_project_governance, hr_timesheet - Security Groups:
Project User(Technical ID:project.group_project_user)Project Administrator(Technical ID:project.group_project_manager)Timesheet Approver(Technical ID:hr_timesheet.group_hr_timesheet_approver)
- Master Data Dependencies: Project master records, milestone stages, work breakdown structures (WBS), bill of quantities (BoQ), and employee billing cost rates.
3. Step-by-Step Configuration & Execution#
Step 1: Navigating to the Module Interface#
- Log into your SmartERP instance at
https://smarterp.et/odoo. - Open the main App Switcher (grid icon in the top-left corner).
- Select the Projects app icon.
- From the top navigation bar, open Projects → Dashboard → My Tasks / All Projects; Timesheets → Timesheets.
{screenshot:construction-material-requisitions-app-switcher-navigation}
Step 2: Creating and Parameterizing Records#
- Click the New button in the top-left control panel.
- Complete the mandatory fields in the record form:
- Project / Task Name (Mandatory): Descriptive title of work package or milestone deliverable
- Assigned Project Team (Mandatory): Lead project manager and operational contributors
- Planned Dates (Mandatory): Scheduled commencement and milestone completion deadlines
- Customer / Stakeholder (Mandatory): Client partner linked to project contract and invoicing terms
- Configure optional operational parameters and localized tags as required:
- Analytic Cost Center (Optional): Dedicated project accounting account for expenditure tracking
- Bill of Quantities (BoQ) Line (Optional): Specific contractual BoQ item code for construction tracking
- Milestone Billing Weight (Optional): Percentage of contract value tied to milestone acceptance
- Click the Save icon in the control bar to commit the record.
{screenshot:construction-material-requisitions-record-creation-form}
Step 3: Validating and Processing Transactions#
- State Transitions: Execute operational state progression (New / Scoping → In Progress → Review / Testing → Completed → Archived).
- Ledger & System Impact: Timesheet confirmations and project purchases post direct expenditures to the project analytic account, enabling real-time cost vs. revenue margin analysis.
- Audit Verification: Automated recording of author ID, timestamp, and immutable revision history.
{screenshot:construction-material-requisitions-transaction-processing-state}
Site Material Management#
Bulk construction materials represent up to 60% of total direct project cost. Strict tracking prevents site pilferage, unauthorized transfers, and excessive wastage exceeding theoretical BoQ allowances.
Procedure: Issuing Site Materials#
- Navigate to Projects > Construction > Store Requests (
smarterp_construction_store_request). - Click New.
- Target Element / Work Activity:
Fourth Floor Slab Concrete Pouring. - Materials Requested:
Muger OPC Cement 42.5N: 350 Bags.Deformed Rebar 16mm (Grade 60): 4.8 Metric Tons.Crushed Coarse Aggregate (02): 28 m3.Concrete Sand (Abay): 18 m3.
- Click Verify Against Theoretical BoQ Limit.
- If requested quantity is within the structural design allowance, status updates to
Within Tolerance. - If requested quantity exceeds design by more than 5%, a supervisory justification is mandatory.
- If requested quantity is within the structural design allowance, status updates to
- The Site Storekeeper issues the goods, generating official Model 20 SIV documentation.
4. Advanced Configuration Points#
- Automated Actions & Scheduled Tasks (Crons):
Project: Flag overdue milestone deadlines(project.ir_cron_overdue_tasks): Runs daily to notify project managers of pending schedule delaysTimesheets: Send unsubmitted reminder alerts(hr_timesheet.ir_cron_timesheet_reminder): Runs weekly on Friday afternoon to remind team members
- Custom Print Templates & Reports:
- Project Status & Milestone Execution Scorecard
- Interim Payment Certificate (IPC) for Construction
- Project Timesheet & Resource Utilization Summary
- Earned Value Management (EVM) Financial Report
- Multi-Company Rules: Record-level security isolation under Company 1 (
Ashewa Technology Solutions S.C.), preventing cross-company ledger leakage across parent and subsidiary legal entities.
5. Comprehensive Troubleshooting Matrix#
| Error Symptom / Exception | Probable Root Cause | Corrective Action / Resolution |
|---|---|---|
Access Rights Error: Cannot view confidential task | User is not listed as a project follower or team member. | Add user to Project Privacy Settings or Collaborators tab. |
Validation Error: Timesheet date outside active stage | Attempting to log labor against a closed or cancelled milestone. | Select an active task stage or request reopening of the target work package. |
Billing Rate Error: Missing employee cost rate | Assigned employee lacks an hourly labor cost rate on their profile. | Configure the employee hourly cost rate under Human Resources → Employees → HR Settings. |