SmartERP Documentation An Ashewa Technology Solutions Platform

Ethiopian calendar and holiday synchronization

How SmartERP synchronizes Ethiopian civil and religious holidays into project timelines, resource working hours, and time-off calendars using Bahire Hasab and Hijri engines.

Operating projects in Ethiopia requires accurate accounting for the 13-month Ethiopian calendar (Ge'ez calendar) and its movable religious holidays. SmartERP Ethiopian Calendar (smart_et_calendar) provides seamless conversion between Gregorian and Ethiopian dates, computes movable holidays mathematically, and automatically updates project working schedules.

[projects-holiday-sync]

The holiday generation engine#

Ethiopian public holidays comprise fixed civil dates, Christian Orthodox movable feasts calculated using the Bahire Hasab computus, and Islamic holidays computed via the Hijri tabular calendar:

Holiday typeCalculation algorithmTypical examples
Fixed Civil & ReligiousFixed Ge'ez solar calendar dates converted to current Gregorian equivalents.Enkutatash (Meskerem 1), Meskel (Meskerem 17), Genna (Tahsas 29 / 28 leap), Adwa Victory Day (Yekatit 23), Timket (Tir 11).
Movable Orthodox (Bahire Hasab)Astronomical computus determining the solar cycle, lunar epact, and Paschal full moon.Fasika (Ethiopian Easter), Siklet (Good Friday), Hosanna (Palm Sunday).
Movable Islamic (Hijri Tabular)Astronomical lunar calculations based on the Umm al-Qura astronomical reference.Eid al-Fitr, Eid al-Adha, Mawlid (Prophet's Birthday).

A monthly background cron (ir_cron_generate_et_holidays) automatically projects holiday occurrences for the current and subsequent Ethiopian fiscal years.

Working-day policies and company calendars#

National holidays affect project delivery timelines by altering available labor capacity. SmartERP applies the company's configured Working-Day Policy:

  1. Company-Wide Leave Generation: When a public holiday is generated or modified, SmartERP creates a corresponding company-wide non-working leave record in the global resource calendar (resource.calendar.leaves).
  2. Conflict Resolution: If an existing leave is already registered on that date, SmartERP retains the holiday record for information without creating duplicate calendar deductions.
  3. Capacity Adjustment: Project task timelines, milestone target dates, and employee daily timesheet targets automatically skip the designated holiday.

Dual calendar UI toggle#

SmartERP features a non-intrusive dual-calendar toggle in the user interface:

  • Calendar Switch: A toggle in the top-right toolbar of Calendar and Gantt views enables instant switching between Gregorian (e.g., October 2026) and Ethiopian (e.g., Meskerem 2019) date representations.
  • Date Picker Localization: Form date and datetime fields accept and display dates in both formats according to user preference settings (res.users.calendar_mode).
  • Reporting Headers: Financial and operational project reports print dates in both formats for dual compliance with local revenue authorities and international stakeholders.
Last updated: 2026-10-16